Skip to main content

When you're working outdoors, remember to look up and out for power lines.

SAFETY:

To help you stay safe while working near Duquesne Light Company (DLC) facilities, we can install temporary protective covering on our electrical facilities (called "cover-up") to help prevent accidental contact with an un-insulated line. Cover-up is not a substitute for other important safety precautions. Please refer to DLC's Outdoor Electrical Safety webpage for more information about working near energized electrical facilities. Even where cover-up is installed, you may still need to take additional precautions when working near DLC facilities to ensure compliance with OSHA and other requirements.

DLC will review cover-up requests on a case-by-case basis but may refuse to cover a line in some circumstances. For example, DLC will not cover a line if the cover-up would cause damage to Company facilities. Consideration must be given to the weight of the cover-up, weather and wind conditions, and the possibility of damage or wire wrapping with nearby Company facilities while the cover-up is installed. 

When you need to work near uncovered DLC facilities, the facilities may need to be de-energized and grounded or be relocated at your expense.

Additionally, cover-up is not intended to provide mechanical protection, nor is it for permanent installation. DLC is not responsible for the condition of its cover-up after installation. 

PROCESS:
  1. Call DLC’s New Business Department at 412-393-4343 to initiate the cover-up request and obtain a work order. 
  2. A Design Technician will contact you to discuss project and installation needs.  
  3. Download, complete and email the cover-up request form to your Design Technician.   
  4. When the installation is approved, an invoice will be created.  Payment must be made prior to installation. 
  5. DLC will schedule and install the cover-up. 
  6. Notify your Design Technician for removal of the cover-up at the completion of your project. 
Check your project status.

Payment: 

All customers, contractors or requestors for the installations of cover-up must make payment before installation. The following charges* will be applied: 

  • A minimum charge to cover the cost of the crew to travel to and from the job site to install and remove the cover-up.
  • A usage charge based on the amount of cover-up
  • A refundable deposit
*Additional charges may apply where the installation period exceeds three months, or where DLC must reposition or replace a damaged cover-up.

These charges cover the use of the cover-up material monthly for a maximum of three months. After three months, the cover-up will need re-inspected in 3-month intervals for the duration of its use.  If additional time is needed, new charges will be calculated. Appropriate deposit charges will be refunded at the end of the project. 


View full terms and conditions here.


We Don’t Just Power Your Lights,
We Power The Moments You Call Life.

One More Reason We’re Larger Than Light.